      Commercial/Industrial Portfolio

THAAD Company Operations Facilities "COF's"

Owner:
U.S. Army Corps of Engineers

Architect:
U.S. Army Corps of Engineers
Fort Worth District

Location:
Fort Hood, Texas



Solis Constructors, Inc. successfully completed the construction of two 11,800sqft Terminal High Altitude Defense (THAAD) Battery - Company Operation Facility Buildings at Fort Hood, Texas. This project provides the U. S. Army and Missile Defense Agency with a state of the art facility designed and constructed to support vital Department of Defense initiatives. Employing the latest Anti-Terrorism/Force Protection (AT/FP) and Life Safety building systems, this facility has cutting edge attributes while meeting all applicable building codes and standards.




SOF C-130 Washrack Hangar

Owner:
U.S. Army Corps of Engineers

Architect:
U.S. Army Corps of Engineers
Albuquerque District

Location:
Cannon AFB
Curry County, New Mexico



The SOF C-130 Washrack Hangar is a 30,000 square foot indoor washrack facility for periodic scheduled and unscheduled maintenance for military aircraft up to the size of a Lockheed C-130 Hercules.  The project also included 35,000 square feet of concrete airfield apron pavement and unique systems, including foam guns, high pressure washrack detergent system, oil/water separator, boiler for aircraft washing, compressed air and an overhead monorail.




Formula One - VIP RV Lot/RR-Shower & Laundry Facility

Owner:
Circuit of the Americas

Architect:
Austin Commercial, L.P.

Location:
Del Valle, Texas


Solis successfully completed the turnkey construction of a VIP RV Lot/RR-Shower and Laundry Facility. The project consists of a masonry building providing restrooms, shower rooms and a laundry facility, in addition to 78  landscaped RV pads with electric, water and sewer hook ups. The scope of work included paving subgrade, asphalt paving, curb and gutter, parking specialties, site utilities, landscape, hardscape and irrigation.  The project is part of the Circuit of the Americas project, a world class race track facility.  It was constructed under tight deadlines necessitated by the schedule for the grand opening Formula One race.




Moore Memorial USARC/AMSA

Owner:
U.S. Army Corps of Engineers

Architect:
Mason and Hangar

Location:
Bryan, Texas


This Government Military Construction project consisted of the phased construction of multiple buildings on one site, including a 42,000 SF ARC Training Building, 7,800 SF Vehicle Organizational Maintenance Shop (OMS), unheated storage building, 1,800 SF Covered Wash Rack, and 65,000 SF heavy duty concrete organizational parking pavement. The facilities include classrooms, training areas, media centers, multimedia presentation areas, conference/meeting areas, physical fitness centers, locker rooms, restrooms, administrative offices, Army Reserve command support areas, arms vaults, SIPRNET café, unheated storage, equipment and tool storage areas, equipment and tool distribution center, vehicle/equipment maintenance bays, and landscaped outdoor recreation areas. This project achieved certified LEED Silver.



CH-47 Aircraft Maintenance Hangar

Owner:
U.S. Army Corps of Engineers

Architect:
U.S. Army Corps of Engineers

Location:
Fort Hood, Texas



This award winning project included the design and phased construction of a 51,000 SF US Army CH-47 Aircraft Maintenance building with 500,000 SF of concrete airfield pavement, as well as hazardous material abatement (Lead, Asbestos and PCB) and demolition of numerous off site buildings and structures. The hangar bay area can house four CH-47 Chinook helicopters, while the adjacent core area includes supporting shop, supply and administration spaces. The facility includes classrooms, training areas, conference/meeting areas, equipment and vehicle maintenance areas, rotary wing aircraft maintenance bays, administrative offices, administrative support areas/offices, maintenance command administrative offices, equipment and tool storage areas, equipment and tool distribution center, arms storage areas, outdoor break areas, and shop areas. The project achieved Certifiable LEED Silver status.



Fort Hood
DOL Warehouse/Central Receiving

Owner:
U.S. Army Corps of Engineers

Architect:
GSC Architects

Location:
Fort Hood, Texas



Solis successfully completed the new construction of a 37,500 square foot DOL Warehouse & Administrative Facility and a separate 5,000 sq. ft. Vehicle Maintenance/Covered Storage Facility The project scope of work consisted of: asbestos and hazardous material remediation, demolition of existing buildings and associated structures, extensive earthwork, drilled piers, site utilities, extensive reinforced cast-in-place concrete foundation with suspended grade beams, tactical tracked vehicle unloading area with concrete ramp and organizational hardstand, specialized concrete floor coatings, pre-engineered metal buildings, structural standing seam metal roofing, firestopping, joint sealants, environmental controls, overhead coiling doors, IDS security system, ATFP compliant aluminum windows, fiberglass translucent wall panel systems, gypsum board assemblies, cathodic protection system, automated meter reading system (EMCS), data and voice communication systems, public address and mass notification system, extension of utilities (primary electrical, communication, OSP, sewer, water, gas), extensive interior mechanical systems (includes refrigerant piping, gas piping and plumbing), extensive interior electrical systems (comm., electrical distribution, SIPRNet), fire suppression system and fire detection and alarm systems.



Austin Coca-Cola Bottling Plant

Owner:
Coca-Cola Enterprises, Inc.

Architect:
Graeber, Simmons & Cowan AIA Architects

Location:
Austin, Texas



Expansion of Austin Coca-Cola's Bottling Plant included two pre-engineered metal buildings totaling more than 46,000 sq. ft.  Facility security was a high priority with the Owner’s facility managers, so temporary measures were taken to ensure all construction personnel where in strict compliance with security requirements. This project was constructed while the facility was in operation, and was finished three weeks ahead of schedule.